An integrated engineering change management process model for a project-based manufacturing

Jinteck Han, Soo Hong Lee, Purevdorj Nyamsuren

Research output: Contribution to journalArticle

6 Citations (Scopus)

Abstract

In a project-based ETO (Engineering-To-Order) industry, design, purchasing, production and quality processes are closely integrated to meet a delivery schedule, cost limitation and quality specification. When an engineering change occurs in a project execution stage, miscommunication of design change may generate a significant cost and delay. This paper suggests a model to capture a design change and share activities for processing change done by each stakeholder. The framework also captures ECR (Engineering Change Request), ECO (Engineering Change Order) and a relationship among them with a result of processes. The data could be used for analysing defects of each process, improving a design quality, and a plan for cost reduction. For capturing, sharing and monitoring every change of drawing element and BOM (Bill of Materials), the model extracts a drawing and BOM from a product structure of a 3D CAD (Computer-Aided Design) system. Extracted data are sent to PLM (Product Life-Cycle Management)/ERP (Enterprise Resource Planning) system for planning, purchasing, manufacturing and quality control processes.

Original languageEnglish
Pages (from-to)745-752
Number of pages8
JournalInternational Journal of Computer Integrated Manufacturing
Volume28
Issue number7
DOIs
Publication statusPublished - 2015 Jul 3

Fingerprint

Drawing (graphics)
Enterprise resource planning
Purchasing
Cost reduction
Quality control
Costs
Life cycle
Computer aided design
Specifications
Planning
Defects
Monitoring
Processing
Industry

All Science Journal Classification (ASJC) codes

  • Aerospace Engineering
  • Mechanical Engineering
  • Computer Science Applications
  • Electrical and Electronic Engineering

Cite this

@article{e9cef15df2ca4d75ada58c8bb0ecd0f2,
title = "An integrated engineering change management process model for a project-based manufacturing",
abstract = "In a project-based ETO (Engineering-To-Order) industry, design, purchasing, production and quality processes are closely integrated to meet a delivery schedule, cost limitation and quality specification. When an engineering change occurs in a project execution stage, miscommunication of design change may generate a significant cost and delay. This paper suggests a model to capture a design change and share activities for processing change done by each stakeholder. The framework also captures ECR (Engineering Change Request), ECO (Engineering Change Order) and a relationship among them with a result of processes. The data could be used for analysing defects of each process, improving a design quality, and a plan for cost reduction. For capturing, sharing and monitoring every change of drawing element and BOM (Bill of Materials), the model extracts a drawing and BOM from a product structure of a 3D CAD (Computer-Aided Design) system. Extracted data are sent to PLM (Product Life-Cycle Management)/ERP (Enterprise Resource Planning) system for planning, purchasing, manufacturing and quality control processes.",
author = "Jinteck Han and Lee, {Soo Hong} and Purevdorj Nyamsuren",
year = "2015",
month = "7",
day = "3",
doi = "10.1080/0951192X.2014.924342",
language = "English",
volume = "28",
pages = "745--752",
journal = "International Journal of Computer Integrated Manufacturing",
issn = "0951-192X",
publisher = "Taylor and Francis Ltd.",
number = "7",

}

An integrated engineering change management process model for a project-based manufacturing. / Han, Jinteck; Lee, Soo Hong; Nyamsuren, Purevdorj.

In: International Journal of Computer Integrated Manufacturing, Vol. 28, No. 7, 03.07.2015, p. 745-752.

Research output: Contribution to journalArticle

TY - JOUR

T1 - An integrated engineering change management process model for a project-based manufacturing

AU - Han, Jinteck

AU - Lee, Soo Hong

AU - Nyamsuren, Purevdorj

PY - 2015/7/3

Y1 - 2015/7/3

N2 - In a project-based ETO (Engineering-To-Order) industry, design, purchasing, production and quality processes are closely integrated to meet a delivery schedule, cost limitation and quality specification. When an engineering change occurs in a project execution stage, miscommunication of design change may generate a significant cost and delay. This paper suggests a model to capture a design change and share activities for processing change done by each stakeholder. The framework also captures ECR (Engineering Change Request), ECO (Engineering Change Order) and a relationship among them with a result of processes. The data could be used for analysing defects of each process, improving a design quality, and a plan for cost reduction. For capturing, sharing and monitoring every change of drawing element and BOM (Bill of Materials), the model extracts a drawing and BOM from a product structure of a 3D CAD (Computer-Aided Design) system. Extracted data are sent to PLM (Product Life-Cycle Management)/ERP (Enterprise Resource Planning) system for planning, purchasing, manufacturing and quality control processes.

AB - In a project-based ETO (Engineering-To-Order) industry, design, purchasing, production and quality processes are closely integrated to meet a delivery schedule, cost limitation and quality specification. When an engineering change occurs in a project execution stage, miscommunication of design change may generate a significant cost and delay. This paper suggests a model to capture a design change and share activities for processing change done by each stakeholder. The framework also captures ECR (Engineering Change Request), ECO (Engineering Change Order) and a relationship among them with a result of processes. The data could be used for analysing defects of each process, improving a design quality, and a plan for cost reduction. For capturing, sharing and monitoring every change of drawing element and BOM (Bill of Materials), the model extracts a drawing and BOM from a product structure of a 3D CAD (Computer-Aided Design) system. Extracted data are sent to PLM (Product Life-Cycle Management)/ERP (Enterprise Resource Planning) system for planning, purchasing, manufacturing and quality control processes.

UR - http://www.scopus.com/inward/record.url?scp=84929027178&partnerID=8YFLogxK

UR - http://www.scopus.com/inward/citedby.url?scp=84929027178&partnerID=8YFLogxK

U2 - 10.1080/0951192X.2014.924342

DO - 10.1080/0951192X.2014.924342

M3 - Article

AN - SCOPUS:84929027178

VL - 28

SP - 745

EP - 752

JO - International Journal of Computer Integrated Manufacturing

JF - International Journal of Computer Integrated Manufacturing

SN - 0951-192X

IS - 7

ER -