Design optimization and structural performance evaluation of plate girder bridge constructed using a turn-over process

Gi Ha Eom, Sung Jae Kim, Tae Hee Lee, Jang Jay Ho Kim

Research output: Contribution to journalArticle

1 Citation (Scopus)

Abstract

A recent trend in bridge construction has been the optimization of the cost-to-performance ratio. The most effective way to optimize the cost-to-performance ratio is to maximize the efficiency of the superstructure. Currently, many bridge engineers and designers favor two- or three- girder plate superstructures, due to their cost advantages. However, research on the performance enhancements of the I-type girder in two- or three- girder plate bridges is lacking. One of the most important performance improvement technologies for the I-type girder is the "preflex" method. In the preflex method, the specimen is inverted during the construction process to apply prestressed cambering to the specimen by using self-weight. However, a problem with the preflex construction method is difficulty with inverting the girder/plate system during the concrete curing process. Therefore, a new inverting system called Turn-Over (TO) wheel was proposed. Using TO wheels, wider variations to the I-type girder design can be achieved. Using this TO construction method, various cross sectional designs of girder plate systems can be considered due to its easiness in inverting the girder/plate system. In this study, the location of concrete confinement sections between the steel I-beams and concrete plates was varied in an I-girder cross-sectional design. Design parameters included effective height, flange thickness, flange width, confining concrete section width, etc. From this study, the optimum cross-sectional design of the I-girder/concrete plate system was achieved. Then, a single 20 m TO girder/plate system and two 20 m TO girder bridges were constructed and tested to evaluate their performance. From the test, failure behavior, load carrying capacity, crack pattern, etc., are obtained. The results are discussed in detail in this paper.

Original languageEnglish
Article number283
JournalMaterials
Volume10
Issue number3
DOIs
Publication statusPublished - 2017 Jan 1

Fingerprint

Plate girder bridges
Concretes
Flanges
Wheels
Costs
Steel
Load limits
Curing
Design optimization
Cracks
Engineers

All Science Journal Classification (ASJC) codes

  • Materials Science(all)

Cite this

@article{7c8069b30bcd4b24ae5a41250d5d3ad1,
title = "Design optimization and structural performance evaluation of plate girder bridge constructed using a turn-over process",
abstract = "A recent trend in bridge construction has been the optimization of the cost-to-performance ratio. The most effective way to optimize the cost-to-performance ratio is to maximize the efficiency of the superstructure. Currently, many bridge engineers and designers favor two- or three- girder plate superstructures, due to their cost advantages. However, research on the performance enhancements of the I-type girder in two- or three- girder plate bridges is lacking. One of the most important performance improvement technologies for the I-type girder is the {"}preflex{"} method. In the preflex method, the specimen is inverted during the construction process to apply prestressed cambering to the specimen by using self-weight. However, a problem with the preflex construction method is difficulty with inverting the girder/plate system during the concrete curing process. Therefore, a new inverting system called Turn-Over (TO) wheel was proposed. Using TO wheels, wider variations to the I-type girder design can be achieved. Using this TO construction method, various cross sectional designs of girder plate systems can be considered due to its easiness in inverting the girder/plate system. In this study, the location of concrete confinement sections between the steel I-beams and concrete plates was varied in an I-girder cross-sectional design. Design parameters included effective height, flange thickness, flange width, confining concrete section width, etc. From this study, the optimum cross-sectional design of the I-girder/concrete plate system was achieved. Then, a single 20 m TO girder/plate system and two 20 m TO girder bridges were constructed and tested to evaluate their performance. From the test, failure behavior, load carrying capacity, crack pattern, etc., are obtained. The results are discussed in detail in this paper.",
author = "Eom, {Gi Ha} and Kim, {Sung Jae} and Lee, {Tae Hee} and Kim, {Jang Jay Ho}",
year = "2017",
month = "1",
day = "1",
doi = "10.3390/ma10030283",
language = "English",
volume = "10",
journal = "Materials",
issn = "1996-1944",
publisher = "MDPI AG",
number = "3",

}

Design optimization and structural performance evaluation of plate girder bridge constructed using a turn-over process. / Eom, Gi Ha; Kim, Sung Jae; Lee, Tae Hee; Kim, Jang Jay Ho.

In: Materials, Vol. 10, No. 3, 283, 01.01.2017.

Research output: Contribution to journalArticle

TY - JOUR

T1 - Design optimization and structural performance evaluation of plate girder bridge constructed using a turn-over process

AU - Eom, Gi Ha

AU - Kim, Sung Jae

AU - Lee, Tae Hee

AU - Kim, Jang Jay Ho

PY - 2017/1/1

Y1 - 2017/1/1

N2 - A recent trend in bridge construction has been the optimization of the cost-to-performance ratio. The most effective way to optimize the cost-to-performance ratio is to maximize the efficiency of the superstructure. Currently, many bridge engineers and designers favor two- or three- girder plate superstructures, due to their cost advantages. However, research on the performance enhancements of the I-type girder in two- or three- girder plate bridges is lacking. One of the most important performance improvement technologies for the I-type girder is the "preflex" method. In the preflex method, the specimen is inverted during the construction process to apply prestressed cambering to the specimen by using self-weight. However, a problem with the preflex construction method is difficulty with inverting the girder/plate system during the concrete curing process. Therefore, a new inverting system called Turn-Over (TO) wheel was proposed. Using TO wheels, wider variations to the I-type girder design can be achieved. Using this TO construction method, various cross sectional designs of girder plate systems can be considered due to its easiness in inverting the girder/plate system. In this study, the location of concrete confinement sections between the steel I-beams and concrete plates was varied in an I-girder cross-sectional design. Design parameters included effective height, flange thickness, flange width, confining concrete section width, etc. From this study, the optimum cross-sectional design of the I-girder/concrete plate system was achieved. Then, a single 20 m TO girder/plate system and two 20 m TO girder bridges were constructed and tested to evaluate their performance. From the test, failure behavior, load carrying capacity, crack pattern, etc., are obtained. The results are discussed in detail in this paper.

AB - A recent trend in bridge construction has been the optimization of the cost-to-performance ratio. The most effective way to optimize the cost-to-performance ratio is to maximize the efficiency of the superstructure. Currently, many bridge engineers and designers favor two- or three- girder plate superstructures, due to their cost advantages. However, research on the performance enhancements of the I-type girder in two- or three- girder plate bridges is lacking. One of the most important performance improvement technologies for the I-type girder is the "preflex" method. In the preflex method, the specimen is inverted during the construction process to apply prestressed cambering to the specimen by using self-weight. However, a problem with the preflex construction method is difficulty with inverting the girder/plate system during the concrete curing process. Therefore, a new inverting system called Turn-Over (TO) wheel was proposed. Using TO wheels, wider variations to the I-type girder design can be achieved. Using this TO construction method, various cross sectional designs of girder plate systems can be considered due to its easiness in inverting the girder/plate system. In this study, the location of concrete confinement sections between the steel I-beams and concrete plates was varied in an I-girder cross-sectional design. Design parameters included effective height, flange thickness, flange width, confining concrete section width, etc. From this study, the optimum cross-sectional design of the I-girder/concrete plate system was achieved. Then, a single 20 m TO girder/plate system and two 20 m TO girder bridges were constructed and tested to evaluate their performance. From the test, failure behavior, load carrying capacity, crack pattern, etc., are obtained. The results are discussed in detail in this paper.

UR - http://www.scopus.com/inward/record.url?scp=85015099631&partnerID=8YFLogxK

UR - http://www.scopus.com/inward/citedby.url?scp=85015099631&partnerID=8YFLogxK

U2 - 10.3390/ma10030283

DO - 10.3390/ma10030283

M3 - Article

VL - 10

JO - Materials

JF - Materials

SN - 1996-1944

IS - 3

M1 - 283

ER -