Enhancing Subcontractors' Participation in BIM-Based Design Coordination under a DBB Contract

Sejun Jang, Yeonsuk Jeong, Ghang Lee, Youngcheol Kang

Research output: Contribution to journalArticle

Abstract

This paper introduces a two-step subcontracting process for building information modeling (BIM)-based design coordination under a design-bid-build (DBB) contract. Although integrated project delivery (IPD) is known to be an ideal contractual method for BIM projects, DBB still has been the dominant contracting method, owing to the complexity of IPD, as well as regional regulations. BIM-based design coordination under DBB can effectively reduce design errors through the value engineering process. However, in practice, the cost reduction realized under DBB is minimal because, unlike under IPD, DBB contracts do not provide incentives for subcontractors to reduce costs. This study proposes that subcontracting be divided into two phases: preconstruction and construction. Only subcontractors who meet the target costs during BIM-based design coordination in the preconstruction phase win the right to work during the construction phase. From case studies, this study finds quantitative cost reductions from this change in the preconstruction process. This study also reveals the manner in which this two-phase process impacts subcontractors' attitudes toward cost-reduction efforts. These findings contribute to maximizing the efficiency of BIM-based design coordination, which will eventually contribute to more efficient delivery of construction projects.

Original languageEnglish
Article number04019022
JournalJournal of Management in Engineering
Volume35
Issue number6
DOIs
Publication statusPublished - 2019 Nov 1

Fingerprint

Cost reduction
Participation
Information modeling
Subcontractors
Bid
Value engineering
Costs
Integrated
Project delivery
Subcontracting

All Science Journal Classification (ASJC) codes

  • Industrial relations
  • Engineering(all)
  • Strategy and Management
  • Management Science and Operations Research

Cite this

@article{c24566cbc4bd4136b3e23ff8acf1e33b,
title = "Enhancing Subcontractors' Participation in BIM-Based Design Coordination under a DBB Contract",
abstract = "This paper introduces a two-step subcontracting process for building information modeling (BIM)-based design coordination under a design-bid-build (DBB) contract. Although integrated project delivery (IPD) is known to be an ideal contractual method for BIM projects, DBB still has been the dominant contracting method, owing to the complexity of IPD, as well as regional regulations. BIM-based design coordination under DBB can effectively reduce design errors through the value engineering process. However, in practice, the cost reduction realized under DBB is minimal because, unlike under IPD, DBB contracts do not provide incentives for subcontractors to reduce costs. This study proposes that subcontracting be divided into two phases: preconstruction and construction. Only subcontractors who meet the target costs during BIM-based design coordination in the preconstruction phase win the right to work during the construction phase. From case studies, this study finds quantitative cost reductions from this change in the preconstruction process. This study also reveals the manner in which this two-phase process impacts subcontractors' attitudes toward cost-reduction efforts. These findings contribute to maximizing the efficiency of BIM-based design coordination, which will eventually contribute to more efficient delivery of construction projects.",
author = "Sejun Jang and Yeonsuk Jeong and Ghang Lee and Youngcheol Kang",
year = "2019",
month = "11",
day = "1",
doi = "10.1061/(ASCE)ME.1943-5479.0000714",
language = "English",
volume = "35",
journal = "Journal of Management in Engineering - ASCE",
issn = "0742-597X",
publisher = "American Society of Civil Engineers (ASCE)",
number = "6",

}

Enhancing Subcontractors' Participation in BIM-Based Design Coordination under a DBB Contract. / Jang, Sejun; Jeong, Yeonsuk; Lee, Ghang; Kang, Youngcheol.

In: Journal of Management in Engineering, Vol. 35, No. 6, 04019022, 01.11.2019.

Research output: Contribution to journalArticle

TY - JOUR

T1 - Enhancing Subcontractors' Participation in BIM-Based Design Coordination under a DBB Contract

AU - Jang, Sejun

AU - Jeong, Yeonsuk

AU - Lee, Ghang

AU - Kang, Youngcheol

PY - 2019/11/1

Y1 - 2019/11/1

N2 - This paper introduces a two-step subcontracting process for building information modeling (BIM)-based design coordination under a design-bid-build (DBB) contract. Although integrated project delivery (IPD) is known to be an ideal contractual method for BIM projects, DBB still has been the dominant contracting method, owing to the complexity of IPD, as well as regional regulations. BIM-based design coordination under DBB can effectively reduce design errors through the value engineering process. However, in practice, the cost reduction realized under DBB is minimal because, unlike under IPD, DBB contracts do not provide incentives for subcontractors to reduce costs. This study proposes that subcontracting be divided into two phases: preconstruction and construction. Only subcontractors who meet the target costs during BIM-based design coordination in the preconstruction phase win the right to work during the construction phase. From case studies, this study finds quantitative cost reductions from this change in the preconstruction process. This study also reveals the manner in which this two-phase process impacts subcontractors' attitudes toward cost-reduction efforts. These findings contribute to maximizing the efficiency of BIM-based design coordination, which will eventually contribute to more efficient delivery of construction projects.

AB - This paper introduces a two-step subcontracting process for building information modeling (BIM)-based design coordination under a design-bid-build (DBB) contract. Although integrated project delivery (IPD) is known to be an ideal contractual method for BIM projects, DBB still has been the dominant contracting method, owing to the complexity of IPD, as well as regional regulations. BIM-based design coordination under DBB can effectively reduce design errors through the value engineering process. However, in practice, the cost reduction realized under DBB is minimal because, unlike under IPD, DBB contracts do not provide incentives for subcontractors to reduce costs. This study proposes that subcontracting be divided into two phases: preconstruction and construction. Only subcontractors who meet the target costs during BIM-based design coordination in the preconstruction phase win the right to work during the construction phase. From case studies, this study finds quantitative cost reductions from this change in the preconstruction process. This study also reveals the manner in which this two-phase process impacts subcontractors' attitudes toward cost-reduction efforts. These findings contribute to maximizing the efficiency of BIM-based design coordination, which will eventually contribute to more efficient delivery of construction projects.

UR - http://www.scopus.com/inward/record.url?scp=85069150002&partnerID=8YFLogxK

UR - http://www.scopus.com/inward/citedby.url?scp=85069150002&partnerID=8YFLogxK

U2 - 10.1061/(ASCE)ME.1943-5479.0000714

DO - 10.1061/(ASCE)ME.1943-5479.0000714

M3 - Article

AN - SCOPUS:85069150002

VL - 35

JO - Journal of Management in Engineering - ASCE

JF - Journal of Management in Engineering - ASCE

SN - 0742-597X

IS - 6

M1 - 04019022

ER -