Erratum

Which risk management is most crucial for controlling project cost? (Journal of Management in Engineering DOI: 10.1061/(ASCE)ME.1943-5479.0000547)

Wooyong Jung, Seung H. Han

Research output: Contribution to journalComment/debate

Abstract

Please note the Acknowledgments section below. The authors unintentionally omitted it in the original paper. Acknowledgments This work was supported by the Korea Science and Engineering Foundation (KOSEF) grant and funded by the Korean government (MOST) (No. NRF-2015R1A2A1A09007327).

Original languageEnglish
Article number08218001
JournalJournal of Management in Engineering
Volume34
Issue number5
DOIs
Publication statusPublished - 2018 Sep 1

Fingerprint

Risk management
Costs
Korea
Government

All Science Journal Classification (ASJC) codes

  • Industrial relations
  • Engineering(all)
  • Strategy and Management
  • Management Science and Operations Research

Cite this

@article{39efae83532f41c8ab1ac0e19554e0b1,
title = "Erratum: Which risk management is most crucial for controlling project cost? (Journal of Management in Engineering DOI: 10.1061/(ASCE)ME.1943-5479.0000547)",
abstract = "Please note the Acknowledgments section below. The authors unintentionally omitted it in the original paper. Acknowledgments This work was supported by the Korea Science and Engineering Foundation (KOSEF) grant and funded by the Korean government (MOST) (No. NRF-2015R1A2A1A09007327).",
author = "Wooyong Jung and Han, {Seung H.}",
year = "2018",
month = "9",
day = "1",
doi = "10.1061/(ASCE)ME.1943-5479.0000627",
language = "English",
volume = "34",
journal = "Journal of Management in Engineering - ASCE",
issn = "0742-597X",
publisher = "American Society of Civil Engineers (ASCE)",
number = "5",

}

TY - JOUR

T1 - Erratum

T2 - Which risk management is most crucial for controlling project cost? (Journal of Management in Engineering DOI: 10.1061/(ASCE)ME.1943-5479.0000547)

AU - Jung, Wooyong

AU - Han, Seung H.

PY - 2018/9/1

Y1 - 2018/9/1

N2 - Please note the Acknowledgments section below. The authors unintentionally omitted it in the original paper. Acknowledgments This work was supported by the Korea Science and Engineering Foundation (KOSEF) grant and funded by the Korean government (MOST) (No. NRF-2015R1A2A1A09007327).

AB - Please note the Acknowledgments section below. The authors unintentionally omitted it in the original paper. Acknowledgments This work was supported by the Korea Science and Engineering Foundation (KOSEF) grant and funded by the Korean government (MOST) (No. NRF-2015R1A2A1A09007327).

UR - http://www.scopus.com/inward/record.url?scp=85047269991&partnerID=8YFLogxK

UR - http://www.scopus.com/inward/citedby.url?scp=85047269991&partnerID=8YFLogxK

U2 - 10.1061/(ASCE)ME.1943-5479.0000627

DO - 10.1061/(ASCE)ME.1943-5479.0000627

M3 - Comment/debate

VL - 34

JO - Journal of Management in Engineering - ASCE

JF - Journal of Management in Engineering - ASCE

SN - 0742-597X

IS - 5

M1 - 08218001

ER -