Erratum: Which risk management is most crucial for controlling project cost? (Journal of Management in Engineering DOI: 10.1061/(ASCE)ME.1943-5479.0000547)

Wooyong Jung, Seung H. Han

Research output: Contribution to journalComment/debate

Abstract

Please note the Acknowledgments section below. The authors unintentionally omitted it in the original paper. Acknowledgments This work was supported by the Korea Science and Engineering Foundation (KOSEF) grant and funded by the Korean government (MOST) (No. NRF-2015R1A2A1A09007327).

Original languageEnglish
Article number08218001
JournalJournal of Management in Engineering
Volume34
Issue number5
DOIs
Publication statusPublished - 2018 Sep 1

All Science Journal Classification (ASJC) codes

  • Industrial relations
  • Engineering(all)
  • Strategy and Management
  • Management Science and Operations Research

Fingerprint Dive into the research topics of 'Erratum: Which risk management is most crucial for controlling project cost? (Journal of Management in Engineering DOI: 10.1061/(ASCE)ME.1943-5479.0000547)'. Together they form a unique fingerprint.

  • Cite this