Evaluation of assembly sequences using generalized flexible assembly systems scheduling problem

Research output: Contribution to journalReview article

1 Citation (Scopus)

Abstract

The evaluation and selection of assembly sequences are performed in the planning stage of assembly processes. This paper deals with the effect of selecting particular assembly sequences to the performance of flexible assembly systems(FAS). The performance of FAS is evaluated using the generalized FAS scheduling problem(GFASSP). Compared to the conventional FASSP, GFASSP tries to select the most efficient assembly sequences for each product as well as minimize cycle time to complete the assemblies in FAS environment while considering the transfer time of subassemblies.

Original languageEnglish
Pages (from-to)777-780
Number of pages4
JournalComputers and Industrial Engineering
Volume33
Issue number3-4
Publication statusPublished - 1997 Dec 1

Fingerprint

Assembly Systems
Scheduling Problem
Scheduling
Evaluation
Planning
Assembly systems
Minimise

All Science Journal Classification (ASJC) codes

  • Information Systems and Management
  • Management Science and Operations Research
  • Industrial and Manufacturing Engineering
  • Applied Mathematics

Cite this

@article{65f8b4a91b2b4e538da28b84e5ae39e9,
title = "Evaluation of assembly sequences using generalized flexible assembly systems scheduling problem",
abstract = "The evaluation and selection of assembly sequences are performed in the planning stage of assembly processes. This paper deals with the effect of selecting particular assembly sequences to the performance of flexible assembly systems(FAS). The performance of FAS is evaluated using the generalized FAS scheduling problem(GFASSP). Compared to the conventional FASSP, GFASSP tries to select the most efficient assembly sequences for each product as well as minimize cycle time to complete the assemblies in FAS environment while considering the transfer time of subassemblies.",
author = "Jeong, {Bong Ju}",
year = "1997",
month = "12",
day = "1",
language = "English",
volume = "33",
pages = "777--780",
journal = "Computers and Industrial Engineering",
issn = "0360-8352",
publisher = "Elsevier Limited",
number = "3-4",

}

Evaluation of assembly sequences using generalized flexible assembly systems scheduling problem. / Jeong, Bong Ju.

In: Computers and Industrial Engineering, Vol. 33, No. 3-4, 01.12.1997, p. 777-780.

Research output: Contribution to journalReview article

TY - JOUR

T1 - Evaluation of assembly sequences using generalized flexible assembly systems scheduling problem

AU - Jeong, Bong Ju

PY - 1997/12/1

Y1 - 1997/12/1

N2 - The evaluation and selection of assembly sequences are performed in the planning stage of assembly processes. This paper deals with the effect of selecting particular assembly sequences to the performance of flexible assembly systems(FAS). The performance of FAS is evaluated using the generalized FAS scheduling problem(GFASSP). Compared to the conventional FASSP, GFASSP tries to select the most efficient assembly sequences for each product as well as minimize cycle time to complete the assemblies in FAS environment while considering the transfer time of subassemblies.

AB - The evaluation and selection of assembly sequences are performed in the planning stage of assembly processes. This paper deals with the effect of selecting particular assembly sequences to the performance of flexible assembly systems(FAS). The performance of FAS is evaluated using the generalized FAS scheduling problem(GFASSP). Compared to the conventional FASSP, GFASSP tries to select the most efficient assembly sequences for each product as well as minimize cycle time to complete the assemblies in FAS environment while considering the transfer time of subassemblies.

UR - http://www.scopus.com/inward/record.url?scp=0031335682&partnerID=8YFLogxK

UR - http://www.scopus.com/inward/citedby.url?scp=0031335682&partnerID=8YFLogxK

M3 - Review article

VL - 33

SP - 777

EP - 780

JO - Computers and Industrial Engineering

JF - Computers and Industrial Engineering

SN - 0360-8352

IS - 3-4

ER -