How to tell if a BIM project is successful: A goal-driven approach

Jongsung Won, Ghang Lee

Research output: Contribution to journalArticle

30 Citations (Scopus)

Abstract

This study investigates the applicability of a success level assessment model for building information modeling (BIM) projects (SLAM BIM). SLAM BIM is a goal-driven method for the sustainable evaluation of a BIM project's success. It was developed on the premise that a project's success cannot be evaluated without first identifying its goals; thus, key performance indicators (KPIs) can vary according to project goal. SLAM BIM consists of five steps for defining BIM goals, uses, KPIs, unit measurements, and data collection forms and processes. To identify appropriate BIM KPIs, the collectability, measurability, and comparability of the candidate BIM KPIs were considered. Data related to schedule, design errors, change orders, response time, and ROI were collected and analyzed in the two projects by using the SLAM BIM process. The validity of SLAM BIM was tested by applying SLAM BIM from the beginning to the end of two construction projects.

Original languageEnglish
Pages (from-to)34-43
Number of pages10
JournalAutomation in Construction
Volume69
DOIs
Publication statusPublished - 2016 Sep 1

All Science Journal Classification (ASJC) codes

  • Control and Systems Engineering
  • Civil and Structural Engineering
  • Building and Construction

Cite this