Abstract
This study investigates the applicability of a success level assessment model for building information modeling (BIM) projects (SLAM BIM). SLAM BIM is a goal-driven method for the sustainable evaluation of a BIM project's success. It was developed on the premise that a project's success cannot be evaluated without first identifying its goals; thus, key performance indicators (KPIs) can vary according to project goal. SLAM BIM consists of five steps for defining BIM goals, uses, KPIs, unit measurements, and data collection forms and processes. To identify appropriate BIM KPIs, the collectability, measurability, and comparability of the candidate BIM KPIs were considered. Data related to schedule, design errors, change orders, response time, and ROI were collected and analyzed in the two projects by using the SLAM BIM process. The validity of SLAM BIM was tested by applying SLAM BIM from the beginning to the end of two construction projects.
Original language | English |
---|---|
Pages (from-to) | 34-43 |
Number of pages | 10 |
Journal | Automation in Construction |
Volume | 69 |
DOIs | |
Publication status | Published - 2016 Sept 1 |
Bibliographical note
Funding Information:This research was supported by a grant ( 15-AUDP-C067817-03 ) from the Architecture & Urban Development Research Program funded by the Ministry of Land, Infrastructure and Transport of the Korean government .
Publisher Copyright:
© 2016 Elsevier B.V. All rights reserved.
All Science Journal Classification (ASJC) codes
- Control and Systems Engineering
- Civil and Structural Engineering
- Building and Construction