Integrated schedule and cost model for repetitive construction process

Kyuman Cho, Taehoon Hong, Changtaek Hyun

Research output: Contribution to journalArticlepeer-review

21 Citations (Scopus)

Abstract

Several efforts have been made by many researchers to develop a model for schedule and cost integration in construction projects, but it is difficult to integrate and manage schedule and cost in an actual construction site using such a model. The integrated schedule and cost model developed in this study (1) enables the planning and control of repetitive construction processes and (2) can be used by a project manager in an actual construction site. Furthermore, an integrated schedule and cost model for the core wall construction, which is an important repetitive process in the recently booming high-rise building construction in terms of scheduling, was developed using the integration model developed in this study. It is expected that the integrated schedule and cost model developed can allow project managers to integrate the schedule and cost of repetitive construction processes more effectively and support the project managers' decision-making.

Original languageEnglish
Pages (from-to)78-88
Number of pages11
JournalJournal of Management in Engineering
Volume26
Issue number2
DOIs
Publication statusPublished - 2010

All Science Journal Classification (ASJC) codes

  • Building and Construction
  • Industrial relations
  • Engineering(all)
  • Strategy and Management
  • Management Science and Operations Research

Fingerprint

Dive into the research topics of 'Integrated schedule and cost model for repetitive construction process'. Together they form a unique fingerprint.

Cite this