Interactive modeller for equipment operation in long-span bridge construction

Byungil Kim, Changyoon Kim, Wonil Lee, Hyoungkwan Kim

Research output: Contribution to conferencePaper

Abstract

Three dimensional (3D) animation of construction simulation makes communication among different project participants effective by visualizing the construction operation. The effect of 3D animation becomes stronger in a more complex operation. However, the modelling process of the 3D animation requires time-consuming efforts. Thus, interactive modelling environment is strongly preferred where equipment, materials, and temporary structures can easily and freely be placed by the construction engineers in a real-time manner. This research aims to develop an equipment operation modeller that can allow users to interactively communicate with the system for long-span bridges. Augmented reality is used as the main methodology for implementing the modeller. The proposed modeller is expected to significantly improve the planning process of construction equipment operations.

Original languageEnglish
Pages280-287
Number of pages8
Publication statusPublished - 2010 Dec 1
Event27th International Symposium on Automation and Robotics in Construction, ISARC 2010 - Bratislava, Slovakia
Duration: 2010 Jun 252010 Jun 27

Other

Other27th International Symposium on Automation and Robotics in Construction, ISARC 2010
CountrySlovakia
CityBratislava
Period10/6/2510/6/27

Fingerprint

Animation
Construction equipment
Augmented reality
Engineers
Planning
Communication

All Science Journal Classification (ASJC) codes

  • Artificial Intelligence
  • Computer Vision and Pattern Recognition
  • Building and Construction

Cite this

Kim, B., Kim, C., Lee, W., & Kim, H. (2010). Interactive modeller for equipment operation in long-span bridge construction. 280-287. Paper presented at 27th International Symposium on Automation and Robotics in Construction, ISARC 2010, Bratislava, Slovakia.
Kim, Byungil ; Kim, Changyoon ; Lee, Wonil ; Kim, Hyoungkwan. / Interactive modeller for equipment operation in long-span bridge construction. Paper presented at 27th International Symposium on Automation and Robotics in Construction, ISARC 2010, Bratislava, Slovakia.8 p.
@conference{233f355749334024b8ad19591b435a70,
title = "Interactive modeller for equipment operation in long-span bridge construction",
abstract = "Three dimensional (3D) animation of construction simulation makes communication among different project participants effective by visualizing the construction operation. The effect of 3D animation becomes stronger in a more complex operation. However, the modelling process of the 3D animation requires time-consuming efforts. Thus, interactive modelling environment is strongly preferred where equipment, materials, and temporary structures can easily and freely be placed by the construction engineers in a real-time manner. This research aims to develop an equipment operation modeller that can allow users to interactively communicate with the system for long-span bridges. Augmented reality is used as the main methodology for implementing the modeller. The proposed modeller is expected to significantly improve the planning process of construction equipment operations.",
author = "Byungil Kim and Changyoon Kim and Wonil Lee and Hyoungkwan Kim",
year = "2010",
month = "12",
day = "1",
language = "English",
pages = "280--287",
note = "27th International Symposium on Automation and Robotics in Construction, ISARC 2010 ; Conference date: 25-06-2010 Through 27-06-2010",

}

Kim, B, Kim, C, Lee, W & Kim, H 2010, 'Interactive modeller for equipment operation in long-span bridge construction', Paper presented at 27th International Symposium on Automation and Robotics in Construction, ISARC 2010, Bratislava, Slovakia, 10/6/25 - 10/6/27 pp. 280-287.

Interactive modeller for equipment operation in long-span bridge construction. / Kim, Byungil; Kim, Changyoon; Lee, Wonil; Kim, Hyoungkwan.

2010. 280-287 Paper presented at 27th International Symposium on Automation and Robotics in Construction, ISARC 2010, Bratislava, Slovakia.

Research output: Contribution to conferencePaper

TY - CONF

T1 - Interactive modeller for equipment operation in long-span bridge construction

AU - Kim, Byungil

AU - Kim, Changyoon

AU - Lee, Wonil

AU - Kim, Hyoungkwan

PY - 2010/12/1

Y1 - 2010/12/1

N2 - Three dimensional (3D) animation of construction simulation makes communication among different project participants effective by visualizing the construction operation. The effect of 3D animation becomes stronger in a more complex operation. However, the modelling process of the 3D animation requires time-consuming efforts. Thus, interactive modelling environment is strongly preferred where equipment, materials, and temporary structures can easily and freely be placed by the construction engineers in a real-time manner. This research aims to develop an equipment operation modeller that can allow users to interactively communicate with the system for long-span bridges. Augmented reality is used as the main methodology for implementing the modeller. The proposed modeller is expected to significantly improve the planning process of construction equipment operations.

AB - Three dimensional (3D) animation of construction simulation makes communication among different project participants effective by visualizing the construction operation. The effect of 3D animation becomes stronger in a more complex operation. However, the modelling process of the 3D animation requires time-consuming efforts. Thus, interactive modelling environment is strongly preferred where equipment, materials, and temporary structures can easily and freely be placed by the construction engineers in a real-time manner. This research aims to develop an equipment operation modeller that can allow users to interactively communicate with the system for long-span bridges. Augmented reality is used as the main methodology for implementing the modeller. The proposed modeller is expected to significantly improve the planning process of construction equipment operations.

UR - http://www.scopus.com/inward/record.url?scp=84863729669&partnerID=8YFLogxK

UR - http://www.scopus.com/inward/citedby.url?scp=84863729669&partnerID=8YFLogxK

M3 - Paper

AN - SCOPUS:84863729669

SP - 280

EP - 287

ER -

Kim B, Kim C, Lee W, Kim H. Interactive modeller for equipment operation in long-span bridge construction. 2010. Paper presented at 27th International Symposium on Automation and Robotics in Construction, ISARC 2010, Bratislava, Slovakia.