TY - GEN
T1 - Life-cycle cost analysis in bridge structures
T2 - 5th IABMAS Workshop on Life-Cycle Cost Analysis and Design of Civil Infrastructure Systems, LCC05
AU - Kang, Jihoon
AU - Lee, Seunghoon
AU - Hong, Taehoon
AU - Koo, Kyo Jin
AU - Hyun, Chang Taek
AU - Lee, Duheon
PY - 2007
Y1 - 2007
N2 - As social infrastructures including bridges require relatively high initial costs and long service lives, the systematic feasibility study is highly recommended at the early phase of projects. This study performs a life cycle cost analysis (LCCA) focused on the bridge superstructures. A cost breakdown structure was developed and also the data required for analysis such as analysis periods and unit costs, are collected. Recently, an on-going railroad bridge project was applied for LCCA as a case study.
AB - As social infrastructures including bridges require relatively high initial costs and long service lives, the systematic feasibility study is highly recommended at the early phase of projects. This study performs a life cycle cost analysis (LCCA) focused on the bridge superstructures. A cost breakdown structure was developed and also the data required for analysis such as analysis periods and unit costs, are collected. Recently, an on-going railroad bridge project was applied for LCCA as a case study.
UR - http://www.scopus.com/inward/record.url?scp=84863266867&partnerID=8YFLogxK
UR - http://www.scopus.com/inward/citedby.url?scp=84863266867&partnerID=8YFLogxK
M3 - Conference contribution
AN - SCOPUS:84863266867
SN - 9780415413565
T3 - Life-Cycle Cost and Performance of Civil Infrastructure Systems - Proceedings of the 5th International Workshop on Life-Cycle Cost Analysis and Design of Civil Infrastructure Systems
SP - 191
EP - 198
BT - Life-Cycle Cost and Performance of Civil Infrastructure Systems - Proceedings of the 5th International Workshop on Life-Cycle Cost Analysis and Design of Civil Infrastructure Systems
Y2 - 16 October 2006 through 18 October 2006
ER -