Abstract

This study describes the environmental impact of the material production, transportation, and construction phases from the construction site perspective. CO 2 emissions for each process were determined using the Korea Life Cycle Inventory Database (LCI DB) in the material production phase, and the actual amounts of oil consumption for transportation equipment were identified in the material transportation phase. Generally, the oil and electric energy consumed during the construction was evaluated by direct monitoring. Through the construction period and cost according to work type, a correlation with CO 2 emissions was also investigated. In addition, CO 2 emissions were examined through the system capacity and gross floor area for each work type. The calculations have shown that CO 2 emissions from the material production phase constitute 93.4% of the total CO 2 emissions. In addition, CO 2 emissions from the material transportation and on-site construction account for 2.4% and 4.2% of the total CO 2 emissions, respectively. This paper concludes that it is important to select appropriate input materials and resources for the reduction of CO 2 emissions. Furthermore, the amount of CO 2 emissions arising from the construction site was reduced by finding and practicing measures to reduce CO 2 emissions for each process.

Original languageEnglish
Article number599
JournalEnergies
Volume9
Issue number8
DOIs
Publication statusPublished - 2016 Jan 1

Fingerprint

Environmental impact
Life cycle
Gross
Monitoring
Life Cycle
Costs
Resources
Energy
Oils

All Science Journal Classification (ASJC) codes

  • Renewable Energy, Sustainability and the Environment
  • Energy Engineering and Power Technology
  • Energy (miscellaneous)
  • Control and Optimization
  • Electrical and Electronic Engineering

Cite this

@article{962496e5453146bdabfa6d2c395282b9,
title = "On-Site measurements of CO 2 emissions during the construction phase of a building complex",
abstract = "This study describes the environmental impact of the material production, transportation, and construction phases from the construction site perspective. CO 2 emissions for each process were determined using the Korea Life Cycle Inventory Database (LCI DB) in the material production phase, and the actual amounts of oil consumption for transportation equipment were identified in the material transportation phase. Generally, the oil and electric energy consumed during the construction was evaluated by direct monitoring. Through the construction period and cost according to work type, a correlation with CO 2 emissions was also investigated. In addition, CO 2 emissions were examined through the system capacity and gross floor area for each work type. The calculations have shown that CO 2 emissions from the material production phase constitute 93.4{\%} of the total CO 2 emissions. In addition, CO 2 emissions from the material transportation and on-site construction account for 2.4{\%} and 4.2{\%} of the total CO 2 emissions, respectively. This paper concludes that it is important to select appropriate input materials and resources for the reduction of CO 2 emissions. Furthermore, the amount of CO 2 emissions arising from the construction site was reduced by finding and practicing measures to reduce CO 2 emissions for each process.",
author = "Seo, {Min Seop} and Taeyeon Kim and Goopyo Hong and Hyungkeun Kim",
year = "2016",
month = "1",
day = "1",
doi = "10.3390/en9080599",
language = "English",
volume = "9",
journal = "Energies",
issn = "1996-1073",
publisher = "Multidisciplinary Digital Publishing Institute (MDPI)",
number = "8",

}

On-Site measurements of CO 2 emissions during the construction phase of a building complex . / Seo, Min Seop; Kim, Taeyeon; Hong, Goopyo; Kim, Hyungkeun.

In: Energies, Vol. 9, No. 8, 599, 01.01.2016.

Research output: Contribution to journalArticle

TY - JOUR

T1 - On-Site measurements of CO 2 emissions during the construction phase of a building complex

AU - Seo, Min Seop

AU - Kim, Taeyeon

AU - Hong, Goopyo

AU - Kim, Hyungkeun

PY - 2016/1/1

Y1 - 2016/1/1

N2 - This study describes the environmental impact of the material production, transportation, and construction phases from the construction site perspective. CO 2 emissions for each process were determined using the Korea Life Cycle Inventory Database (LCI DB) in the material production phase, and the actual amounts of oil consumption for transportation equipment were identified in the material transportation phase. Generally, the oil and electric energy consumed during the construction was evaluated by direct monitoring. Through the construction period and cost according to work type, a correlation with CO 2 emissions was also investigated. In addition, CO 2 emissions were examined through the system capacity and gross floor area for each work type. The calculations have shown that CO 2 emissions from the material production phase constitute 93.4% of the total CO 2 emissions. In addition, CO 2 emissions from the material transportation and on-site construction account for 2.4% and 4.2% of the total CO 2 emissions, respectively. This paper concludes that it is important to select appropriate input materials and resources for the reduction of CO 2 emissions. Furthermore, the amount of CO 2 emissions arising from the construction site was reduced by finding and practicing measures to reduce CO 2 emissions for each process.

AB - This study describes the environmental impact of the material production, transportation, and construction phases from the construction site perspective. CO 2 emissions for each process were determined using the Korea Life Cycle Inventory Database (LCI DB) in the material production phase, and the actual amounts of oil consumption for transportation equipment were identified in the material transportation phase. Generally, the oil and electric energy consumed during the construction was evaluated by direct monitoring. Through the construction period and cost according to work type, a correlation with CO 2 emissions was also investigated. In addition, CO 2 emissions were examined through the system capacity and gross floor area for each work type. The calculations have shown that CO 2 emissions from the material production phase constitute 93.4% of the total CO 2 emissions. In addition, CO 2 emissions from the material transportation and on-site construction account for 2.4% and 4.2% of the total CO 2 emissions, respectively. This paper concludes that it is important to select appropriate input materials and resources for the reduction of CO 2 emissions. Furthermore, the amount of CO 2 emissions arising from the construction site was reduced by finding and practicing measures to reduce CO 2 emissions for each process.

UR - http://www.scopus.com/inward/record.url?scp=84982980761&partnerID=8YFLogxK

UR - http://www.scopus.com/inward/citedby.url?scp=84982980761&partnerID=8YFLogxK

U2 - 10.3390/en9080599

DO - 10.3390/en9080599

M3 - Article

AN - SCOPUS:84982980761

VL - 9

JO - Energies

JF - Energies

SN - 1996-1073

IS - 8

M1 - 599

ER -