PRACTICAL IMPLEMENTATION OF SEMI-AUTOMATED AS-BUILT BIM CREATION FOR COMPLEX INDOOR ENVIRONMENTS

Sanghyun Yoon, Jaehoon Jung, Joon Heo

Research output: Contribution to journalConference article

5 Citations (Scopus)

Abstract

In recent days, for efficient management and operation of existing buildings, the importance of as-built BIM is emphasized in AEC/FM domain. However, fully automated as-built BIM creation is a tough issue since newly-constructed buildings are becoming more complex. To manage this problem, our research group has developed a semi-automated approach, focusing on productive 3D as-built BIM creation for complex indoor environments. In order to test its feasibility for a variety of complex indoor environments, we applied the developed approach to model the 'Charlotte stairs' in Lotte World Mall, Korea. The approach includes 4 main phases: data acquisition, data pre-processing, geometric drawing, and as-built BIM creation. In the data acquisition phase, due to its complex structure, we moved the scanner location several times to obtain the entire point clouds of the test site. After which, data pre-processing phase entailing point-cloud registration, noise removal, and coordinate transformation was followed. The 3D geometric drawing was created using the RANSAC-based plane detection and boundary tracing methods. Finally, in order to create a semantically-rich BIM, the geometric drawing was imported into the commercial BIM software. The final as-built BIM confirmed that the feasibility of the proposed approach in the complex indoor environment.

Original languageEnglish
Pages (from-to)143-146
Number of pages4
JournalInternational Archives of the Photogrammetry, Remote Sensing and Spatial Information Sciences - ISPRS Archives
Volume40
Issue number4W5
DOIs
Publication statusPublished - 2015 May 11
EventISPRS WG IV/7 and WG V/4 Joint Workshop on Indoor-Outdoor Seamless Modelling, Mapping and Navigation - Tokyo, Japan
Duration: 2015 May 212015 May 22

Fingerprint

Data acquisition
data acquisition
Shopping centers
Stairs
building
Processing
Korea
scanner
software
management
indoor environment
Group
test

All Science Journal Classification (ASJC) codes

  • Information Systems
  • Geography, Planning and Development

Cite this

@article{c7822fd26a0643a1a875cd5db89dd83e,
title = "PRACTICAL IMPLEMENTATION OF SEMI-AUTOMATED AS-BUILT BIM CREATION FOR COMPLEX INDOOR ENVIRONMENTS",
abstract = "In recent days, for efficient management and operation of existing buildings, the importance of as-built BIM is emphasized in AEC/FM domain. However, fully automated as-built BIM creation is a tough issue since newly-constructed buildings are becoming more complex. To manage this problem, our research group has developed a semi-automated approach, focusing on productive 3D as-built BIM creation for complex indoor environments. In order to test its feasibility for a variety of complex indoor environments, we applied the developed approach to model the 'Charlotte stairs' in Lotte World Mall, Korea. The approach includes 4 main phases: data acquisition, data pre-processing, geometric drawing, and as-built BIM creation. In the data acquisition phase, due to its complex structure, we moved the scanner location several times to obtain the entire point clouds of the test site. After which, data pre-processing phase entailing point-cloud registration, noise removal, and coordinate transformation was followed. The 3D geometric drawing was created using the RANSAC-based plane detection and boundary tracing methods. Finally, in order to create a semantically-rich BIM, the geometric drawing was imported into the commercial BIM software. The final as-built BIM confirmed that the feasibility of the proposed approach in the complex indoor environment.",
author = "Sanghyun Yoon and Jaehoon Jung and Joon Heo",
year = "2015",
month = "5",
day = "11",
doi = "10.5194/isprsarchives-XL-4-W5-143-2015",
language = "English",
volume = "40",
pages = "143--146",
journal = "International Archives of the Photogrammetry, Remote Sensing and Spatial Information Sciences - ISPRS Archives",
issn = "1682-1750",
number = "4W5",

}

TY - JOUR

T1 - PRACTICAL IMPLEMENTATION OF SEMI-AUTOMATED AS-BUILT BIM CREATION FOR COMPLEX INDOOR ENVIRONMENTS

AU - Yoon, Sanghyun

AU - Jung, Jaehoon

AU - Heo, Joon

PY - 2015/5/11

Y1 - 2015/5/11

N2 - In recent days, for efficient management and operation of existing buildings, the importance of as-built BIM is emphasized in AEC/FM domain. However, fully automated as-built BIM creation is a tough issue since newly-constructed buildings are becoming more complex. To manage this problem, our research group has developed a semi-automated approach, focusing on productive 3D as-built BIM creation for complex indoor environments. In order to test its feasibility for a variety of complex indoor environments, we applied the developed approach to model the 'Charlotte stairs' in Lotte World Mall, Korea. The approach includes 4 main phases: data acquisition, data pre-processing, geometric drawing, and as-built BIM creation. In the data acquisition phase, due to its complex structure, we moved the scanner location several times to obtain the entire point clouds of the test site. After which, data pre-processing phase entailing point-cloud registration, noise removal, and coordinate transformation was followed. The 3D geometric drawing was created using the RANSAC-based plane detection and boundary tracing methods. Finally, in order to create a semantically-rich BIM, the geometric drawing was imported into the commercial BIM software. The final as-built BIM confirmed that the feasibility of the proposed approach in the complex indoor environment.

AB - In recent days, for efficient management and operation of existing buildings, the importance of as-built BIM is emphasized in AEC/FM domain. However, fully automated as-built BIM creation is a tough issue since newly-constructed buildings are becoming more complex. To manage this problem, our research group has developed a semi-automated approach, focusing on productive 3D as-built BIM creation for complex indoor environments. In order to test its feasibility for a variety of complex indoor environments, we applied the developed approach to model the 'Charlotte stairs' in Lotte World Mall, Korea. The approach includes 4 main phases: data acquisition, data pre-processing, geometric drawing, and as-built BIM creation. In the data acquisition phase, due to its complex structure, we moved the scanner location several times to obtain the entire point clouds of the test site. After which, data pre-processing phase entailing point-cloud registration, noise removal, and coordinate transformation was followed. The 3D geometric drawing was created using the RANSAC-based plane detection and boundary tracing methods. Finally, in order to create a semantically-rich BIM, the geometric drawing was imported into the commercial BIM software. The final as-built BIM confirmed that the feasibility of the proposed approach in the complex indoor environment.

UR - http://www.scopus.com/inward/record.url?scp=84933039745&partnerID=8YFLogxK

UR - http://www.scopus.com/inward/citedby.url?scp=84933039745&partnerID=8YFLogxK

U2 - 10.5194/isprsarchives-XL-4-W5-143-2015

DO - 10.5194/isprsarchives-XL-4-W5-143-2015

M3 - Conference article

VL - 40

SP - 143

EP - 146

JO - International Archives of the Photogrammetry, Remote Sensing and Spatial Information Sciences - ISPRS Archives

JF - International Archives of the Photogrammetry, Remote Sensing and Spatial Information Sciences - ISPRS Archives

SN - 1682-1750

IS - 4W5

ER -