@inproceedings{913b94e912d74f2fa35fd8ad1cb019fb,
title = "Probabilistic cost model for bridge integrated project delivery and management",
author = "Huang, {M. G.} and Kim, {B. G.} and Lee, {S. H.} and Park, {Y. H.}",
year = "2008",
language = "English",
isbn = "9780415468442",
series = "Bridge Maintenance, Safety, Management, Health Monitoring and Informatics - Proceedings of the 4th International Conference on Bridge Maintenance, Safety and Management",
pages = "434",
booktitle = "Bridge Maintenance, Safety, Management, Health Monitoring and Informatics - Proceedings of the 4th International Conference on Bridge Maintenance, Safety and Management",
note = "4th International Conference on Bridge Maintenance, IABMAS'08 ; Conference date: 13-07-2008 Through 17-07-2008",
}