Risk-integrated cash flow forecasting for overseas construction projects

Seung Heon Han, Hyung Keun Park, Sang Min Yeom, Myung Jin Chae, Du Yon Kim

Research output: Contribution to journalArticle

4 Citations (Scopus)

Abstract

Construction firms have long attempted to forecast a project cash flow at the initial stage of a project, which is closely related to the payment conditions and financing schedules. There are, however, diverse risk factors influencing project cash flow, in particular for the domain of international projects, which often fluctuate because of a myriad of external as well as internal uncertainties. In this research, risk factors that impact the soundness of cash flow are classified into two categories: financial risks and project-specific risks. The former refers to the external economic conditions such as exchange rate, cost escalation, and interest rate which can be analyzed through a probabilistic financial algorithm. Then, the project-specific risks such as host country's geotechnical conditions, weather and climate differences, and resource delivery conditions are further assessed through utility curves to represent the firm's unique risk perceptions and thresholds to the amount of risk exposures. Results of cash flow forecasts by the proposed approach are compared with the actual cash flow of a retrospective case project. It is found that construction firms better decide on a decent level of cash contingency and the probable net-profit at completion by the adoption of the proposed approach.

Original languageEnglish
Pages (from-to)875-886
Number of pages12
JournalKSCE Journal of Civil Engineering
Volume18
Issue number4
DOIs
Publication statusPublished - 2014 Jan 1

Fingerprint

Risk perception
Profitability
Economics
Costs
Uncertainty

All Science Journal Classification (ASJC) codes

  • Civil and Structural Engineering

Cite this

Han, Seung Heon ; Park, Hyung Keun ; Yeom, Sang Min ; Chae, Myung Jin ; Kim, Du Yon. / Risk-integrated cash flow forecasting for overseas construction projects. In: KSCE Journal of Civil Engineering. 2014 ; Vol. 18, No. 4. pp. 875-886.
@article{c7510b6537ba46ebb71f623cc71d901e,
title = "Risk-integrated cash flow forecasting for overseas construction projects",
abstract = "Construction firms have long attempted to forecast a project cash flow at the initial stage of a project, which is closely related to the payment conditions and financing schedules. There are, however, diverse risk factors influencing project cash flow, in particular for the domain of international projects, which often fluctuate because of a myriad of external as well as internal uncertainties. In this research, risk factors that impact the soundness of cash flow are classified into two categories: financial risks and project-specific risks. The former refers to the external economic conditions such as exchange rate, cost escalation, and interest rate which can be analyzed through a probabilistic financial algorithm. Then, the project-specific risks such as host country's geotechnical conditions, weather and climate differences, and resource delivery conditions are further assessed through utility curves to represent the firm's unique risk perceptions and thresholds to the amount of risk exposures. Results of cash flow forecasts by the proposed approach are compared with the actual cash flow of a retrospective case project. It is found that construction firms better decide on a decent level of cash contingency and the probable net-profit at completion by the adoption of the proposed approach.",
author = "Han, {Seung Heon} and Park, {Hyung Keun} and Yeom, {Sang Min} and Chae, {Myung Jin} and Kim, {Du Yon}",
year = "2014",
month = "1",
day = "1",
doi = "10.1007/s12205-014-0464-8",
language = "English",
volume = "18",
pages = "875--886",
journal = "KSCE Journal of Civil Engineering",
issn = "1226-7988",
publisher = "Korean Society of Civil Engineers",
number = "4",

}

Risk-integrated cash flow forecasting for overseas construction projects. / Han, Seung Heon; Park, Hyung Keun; Yeom, Sang Min; Chae, Myung Jin; Kim, Du Yon.

In: KSCE Journal of Civil Engineering, Vol. 18, No. 4, 01.01.2014, p. 875-886.

Research output: Contribution to journalArticle

TY - JOUR

T1 - Risk-integrated cash flow forecasting for overseas construction projects

AU - Han, Seung Heon

AU - Park, Hyung Keun

AU - Yeom, Sang Min

AU - Chae, Myung Jin

AU - Kim, Du Yon

PY - 2014/1/1

Y1 - 2014/1/1

N2 - Construction firms have long attempted to forecast a project cash flow at the initial stage of a project, which is closely related to the payment conditions and financing schedules. There are, however, diverse risk factors influencing project cash flow, in particular for the domain of international projects, which often fluctuate because of a myriad of external as well as internal uncertainties. In this research, risk factors that impact the soundness of cash flow are classified into two categories: financial risks and project-specific risks. The former refers to the external economic conditions such as exchange rate, cost escalation, and interest rate which can be analyzed through a probabilistic financial algorithm. Then, the project-specific risks such as host country's geotechnical conditions, weather and climate differences, and resource delivery conditions are further assessed through utility curves to represent the firm's unique risk perceptions and thresholds to the amount of risk exposures. Results of cash flow forecasts by the proposed approach are compared with the actual cash flow of a retrospective case project. It is found that construction firms better decide on a decent level of cash contingency and the probable net-profit at completion by the adoption of the proposed approach.

AB - Construction firms have long attempted to forecast a project cash flow at the initial stage of a project, which is closely related to the payment conditions and financing schedules. There are, however, diverse risk factors influencing project cash flow, in particular for the domain of international projects, which often fluctuate because of a myriad of external as well as internal uncertainties. In this research, risk factors that impact the soundness of cash flow are classified into two categories: financial risks and project-specific risks. The former refers to the external economic conditions such as exchange rate, cost escalation, and interest rate which can be analyzed through a probabilistic financial algorithm. Then, the project-specific risks such as host country's geotechnical conditions, weather and climate differences, and resource delivery conditions are further assessed through utility curves to represent the firm's unique risk perceptions and thresholds to the amount of risk exposures. Results of cash flow forecasts by the proposed approach are compared with the actual cash flow of a retrospective case project. It is found that construction firms better decide on a decent level of cash contingency and the probable net-profit at completion by the adoption of the proposed approach.

UR - http://www.scopus.com/inward/record.url?scp=84899656205&partnerID=8YFLogxK

UR - http://www.scopus.com/inward/citedby.url?scp=84899656205&partnerID=8YFLogxK

U2 - 10.1007/s12205-014-0464-8

DO - 10.1007/s12205-014-0464-8

M3 - Article

VL - 18

SP - 875

EP - 886

JO - KSCE Journal of Civil Engineering

JF - KSCE Journal of Civil Engineering

SN - 1226-7988

IS - 4

ER -