Simulation-based optimal production planning model using dynamic lead time estimation

Sun Hoon Kim, Jeong Woo Kim, Young Hoon Lee

Research output: Contribution to journalArticle

4 Citations (Scopus)

Abstract

Production planning and scheduling models for the semiconductor fabrication manufacturing are suggested in various types according to the objectives and factors taken into consideration. The lead time is one of the important factors in production planning, but there does not exist a simple way to describe and include it in the model. In this paper, the clearing time method is suggested to model the lead time in the fabrication process of the semiconductor manufacturing, so that the dynamically changing environment on the lead time and work in process (WIP) status are considered. It is shown through the experimental computation that the suggested model yields the accurate description on the lead time on the planning model, and the appropriate planning model with good results for the important performance measures in the semiconductor manufacturing.

Original languageEnglish
Pages (from-to)1381-1391
Number of pages11
JournalInternational Journal of Advanced Manufacturing Technology
Volume75
Issue number9-12
DOIs
Publication statusPublished - 2014 Nov 16

Fingerprint

Dynamic models
Planning
Semiconductor materials
Fabrication
Scheduling

All Science Journal Classification (ASJC) codes

  • Control and Systems Engineering
  • Software
  • Mechanical Engineering
  • Computer Science Applications
  • Industrial and Manufacturing Engineering

Cite this

@article{eb95eb9ce7824a17ac54c1cdfc24d329,
title = "Simulation-based optimal production planning model using dynamic lead time estimation",
abstract = "Production planning and scheduling models for the semiconductor fabrication manufacturing are suggested in various types according to the objectives and factors taken into consideration. The lead time is one of the important factors in production planning, but there does not exist a simple way to describe and include it in the model. In this paper, the clearing time method is suggested to model the lead time in the fabrication process of the semiconductor manufacturing, so that the dynamically changing environment on the lead time and work in process (WIP) status are considered. It is shown through the experimental computation that the suggested model yields the accurate description on the lead time on the planning model, and the appropriate planning model with good results for the important performance measures in the semiconductor manufacturing.",
author = "Kim, {Sun Hoon} and Kim, {Jeong Woo} and Lee, {Young Hoon}",
year = "2014",
month = "11",
day = "16",
doi = "10.1007/s00170-014-6209-5",
language = "English",
volume = "75",
pages = "1381--1391",
journal = "International Journal of Advanced Manufacturing Technology",
issn = "0268-3768",
publisher = "Springer London",
number = "9-12",

}

Simulation-based optimal production planning model using dynamic lead time estimation. / Kim, Sun Hoon; Kim, Jeong Woo; Lee, Young Hoon.

In: International Journal of Advanced Manufacturing Technology, Vol. 75, No. 9-12, 16.11.2014, p. 1381-1391.

Research output: Contribution to journalArticle

TY - JOUR

T1 - Simulation-based optimal production planning model using dynamic lead time estimation

AU - Kim, Sun Hoon

AU - Kim, Jeong Woo

AU - Lee, Young Hoon

PY - 2014/11/16

Y1 - 2014/11/16

N2 - Production planning and scheduling models for the semiconductor fabrication manufacturing are suggested in various types according to the objectives and factors taken into consideration. The lead time is one of the important factors in production planning, but there does not exist a simple way to describe and include it in the model. In this paper, the clearing time method is suggested to model the lead time in the fabrication process of the semiconductor manufacturing, so that the dynamically changing environment on the lead time and work in process (WIP) status are considered. It is shown through the experimental computation that the suggested model yields the accurate description on the lead time on the planning model, and the appropriate planning model with good results for the important performance measures in the semiconductor manufacturing.

AB - Production planning and scheduling models for the semiconductor fabrication manufacturing are suggested in various types according to the objectives and factors taken into consideration. The lead time is one of the important factors in production planning, but there does not exist a simple way to describe and include it in the model. In this paper, the clearing time method is suggested to model the lead time in the fabrication process of the semiconductor manufacturing, so that the dynamically changing environment on the lead time and work in process (WIP) status are considered. It is shown through the experimental computation that the suggested model yields the accurate description on the lead time on the planning model, and the appropriate planning model with good results for the important performance measures in the semiconductor manufacturing.

UR - http://www.scopus.com/inward/record.url?scp=85027957104&partnerID=8YFLogxK

UR - http://www.scopus.com/inward/citedby.url?scp=85027957104&partnerID=8YFLogxK

U2 - 10.1007/s00170-014-6209-5

DO - 10.1007/s00170-014-6209-5

M3 - Article

AN - SCOPUS:85027957104

VL - 75

SP - 1381

EP - 1391

JO - International Journal of Advanced Manufacturing Technology

JF - International Journal of Advanced Manufacturing Technology

SN - 0268-3768

IS - 9-12

ER -