A discussion covers CO2 recovery from a newly constructed demo pilot plant with a 2 ton/day capacity; characteristics of the pilot plant, which was constructed near a 250 Mw LNG-based power plant; absorbents tested, e.g., MEA and blended absorbents containing primary, secondary, tertiary and sterically hindered amine; trends in the CO2 market; and economic aspects. This is an abstract of a paper presented at the 2007 AIChE Annual Meeting (Salt Lake City, UT 11/4-9/2007).

Original languageEnglish
Title of host publication2007 AIChE Annual Meeting
Publication statusPublished - 2007 Dec 1
Event2007 AIChE Annual Meeting - Salt Lake City, UT, United States
Duration: 2007 Nov 42007 Nov 9

Publication series

Name2007 AIChE Annual Meeting

Other

Other2007 AIChE Annual Meeting
CountryUnited States
CitySalt Lake City, UT
Period07/11/407/11/9

Fingerprint

Chemical Phenomena
Power Plants
Liquefied natural gas
Pilot plants
Power plants
Economics
Amines
Recovery

All Science Journal Classification (ASJC) codes

  • Biotechnology
  • Chemical Engineering(all)
  • Bioengineering
  • Safety, Risk, Reliability and Quality

Cite this

Lee, S., Song, H. J., Park, J. W., & Lee, J. H. (2007). Technical and economic assessment of chemical absorption process at LNG based power plant. In 2007 AIChE Annual Meeting (2007 AIChE Annual Meeting).
Lee, Seungmoon ; Song, Ho Jun ; Park, Jin Won ; Lee, Joon Ho. / Technical and economic assessment of chemical absorption process at LNG based power plant. 2007 AIChE Annual Meeting. 2007. (2007 AIChE Annual Meeting).
@inproceedings{dadb8b5155c440ccb75754b1f7f4ed78,
title = "Technical and economic assessment of chemical absorption process at LNG based power plant",
abstract = "A discussion covers CO2 recovery from a newly constructed demo pilot plant with a 2 ton/day capacity; characteristics of the pilot plant, which was constructed near a 250 Mw LNG-based power plant; absorbents tested, e.g., MEA and blended absorbents containing primary, secondary, tertiary and sterically hindered amine; trends in the CO2 market; and economic aspects. This is an abstract of a paper presented at the 2007 AIChE Annual Meeting (Salt Lake City, UT 11/4-9/2007).",
author = "Seungmoon Lee and Song, {Ho Jun} and Park, {Jin Won} and Lee, {Joon Ho}",
year = "2007",
month = "12",
day = "1",
language = "English",
isbn = "9780816910229",
series = "2007 AIChE Annual Meeting",
booktitle = "2007 AIChE Annual Meeting",

}

Lee, S, Song, HJ, Park, JW & Lee, JH 2007, Technical and economic assessment of chemical absorption process at LNG based power plant. in 2007 AIChE Annual Meeting. 2007 AIChE Annual Meeting, 2007 AIChE Annual Meeting, Salt Lake City, UT, United States, 07/11/4.

Technical and economic assessment of chemical absorption process at LNG based power plant. / Lee, Seungmoon; Song, Ho Jun; Park, Jin Won; Lee, Joon Ho.

2007 AIChE Annual Meeting. 2007. (2007 AIChE Annual Meeting).

Research output: Chapter in Book/Report/Conference proceedingConference contribution

TY - GEN

T1 - Technical and economic assessment of chemical absorption process at LNG based power plant

AU - Lee, Seungmoon

AU - Song, Ho Jun

AU - Park, Jin Won

AU - Lee, Joon Ho

PY - 2007/12/1

Y1 - 2007/12/1

N2 - A discussion covers CO2 recovery from a newly constructed demo pilot plant with a 2 ton/day capacity; characteristics of the pilot plant, which was constructed near a 250 Mw LNG-based power plant; absorbents tested, e.g., MEA and blended absorbents containing primary, secondary, tertiary and sterically hindered amine; trends in the CO2 market; and economic aspects. This is an abstract of a paper presented at the 2007 AIChE Annual Meeting (Salt Lake City, UT 11/4-9/2007).

AB - A discussion covers CO2 recovery from a newly constructed demo pilot plant with a 2 ton/day capacity; characteristics of the pilot plant, which was constructed near a 250 Mw LNG-based power plant; absorbents tested, e.g., MEA and blended absorbents containing primary, secondary, tertiary and sterically hindered amine; trends in the CO2 market; and economic aspects. This is an abstract of a paper presented at the 2007 AIChE Annual Meeting (Salt Lake City, UT 11/4-9/2007).

UR - http://www.scopus.com/inward/record.url?scp=58049125552&partnerID=8YFLogxK

UR - http://www.scopus.com/inward/citedby.url?scp=58049125552&partnerID=8YFLogxK

M3 - Conference contribution

AN - SCOPUS:58049125552

SN - 9780816910229

T3 - 2007 AIChE Annual Meeting

BT - 2007 AIChE Annual Meeting

ER -

Lee S, Song HJ, Park JW, Lee JH. Technical and economic assessment of chemical absorption process at LNG based power plant. In 2007 AIChE Annual Meeting. 2007. (2007 AIChE Annual Meeting).