What enables a high-risk project to yield high return from a construction contractor's perspective?

Jin Woo Won, Wooyong Jung, Seung Heon Han, Sungmin Yun, Bonsang Koo

Research output: Contribution to journalArticle

Abstract

"High risk high return" is a general rule in the overall industry; however, high-risk projects in the construction industry frequently fail to yield a high return. In order to achieve a sustainable business in the international construction market, contractors require an average to high return yield under high-risk conditions. This study aims to reveal what risk factors and risk management performance enables high-risk projects to yield high returns. The study investigated 124 international construction projects by Korean contractors and classified them into four groups: high-risk high-return (HH), high-risk low-return (HL), low-risk high-return (LH), and low-risk low-return (LL). The study found that risk assessment accuracy was the most important trigger in discriminating between high return projects (HH, LH) and low return projects (HL, LL), whereas risk mitigation performance showed little difference between high return and low return projects. In addition, the contingency amount did not significantly affect project return in HL, LH, and LL projects, but HH projects showed a positive relation between contingency and predicted risk amount. This article contributes to recognizing the differences between high return and low return projects and provides insights for practitioners into the relation between risk management performance and high returns in different risk conditions.

Original languageEnglish
Article number5971
JournalSustainability (Switzerland)
Volume11
Issue number21
DOIs
Publication statusPublished - 2019 Nov 1

Fingerprint

Contractors
project
Risk management
risk management
contingency
construction industry
Construction industry
risk factor
performance
Risk assessment
risk assessment

All Science Journal Classification (ASJC) codes

  • Geography, Planning and Development
  • Renewable Energy, Sustainability and the Environment
  • Management, Monitoring, Policy and Law

Cite this

@article{ae9a0691589344ba810bce280f4f2a73,
title = "What enables a high-risk project to yield high return from a construction contractor's perspective?",
abstract = "{"}High risk high return{"} is a general rule in the overall industry; however, high-risk projects in the construction industry frequently fail to yield a high return. In order to achieve a sustainable business in the international construction market, contractors require an average to high return yield under high-risk conditions. This study aims to reveal what risk factors and risk management performance enables high-risk projects to yield high returns. The study investigated 124 international construction projects by Korean contractors and classified them into four groups: high-risk high-return (HH), high-risk low-return (HL), low-risk high-return (LH), and low-risk low-return (LL). The study found that risk assessment accuracy was the most important trigger in discriminating between high return projects (HH, LH) and low return projects (HL, LL), whereas risk mitigation performance showed little difference between high return and low return projects. In addition, the contingency amount did not significantly affect project return in HL, LH, and LL projects, but HH projects showed a positive relation between contingency and predicted risk amount. This article contributes to recognizing the differences between high return and low return projects and provides insights for practitioners into the relation between risk management performance and high returns in different risk conditions.",
author = "Won, {Jin Woo} and Wooyong Jung and Han, {Seung Heon} and Sungmin Yun and Bonsang Koo",
year = "2019",
month = "11",
day = "1",
doi = "10.3390/su11215971",
language = "English",
volume = "11",
journal = "Sustainability",
issn = "2071-1050",
publisher = "MDPI AG",
number = "21",

}

What enables a high-risk project to yield high return from a construction contractor's perspective? / Won, Jin Woo; Jung, Wooyong; Han, Seung Heon; Yun, Sungmin; Koo, Bonsang.

In: Sustainability (Switzerland), Vol. 11, No. 21, 5971, 01.11.2019.

Research output: Contribution to journalArticle

TY - JOUR

T1 - What enables a high-risk project to yield high return from a construction contractor's perspective?

AU - Won, Jin Woo

AU - Jung, Wooyong

AU - Han, Seung Heon

AU - Yun, Sungmin

AU - Koo, Bonsang

PY - 2019/11/1

Y1 - 2019/11/1

N2 - "High risk high return" is a general rule in the overall industry; however, high-risk projects in the construction industry frequently fail to yield a high return. In order to achieve a sustainable business in the international construction market, contractors require an average to high return yield under high-risk conditions. This study aims to reveal what risk factors and risk management performance enables high-risk projects to yield high returns. The study investigated 124 international construction projects by Korean contractors and classified them into four groups: high-risk high-return (HH), high-risk low-return (HL), low-risk high-return (LH), and low-risk low-return (LL). The study found that risk assessment accuracy was the most important trigger in discriminating between high return projects (HH, LH) and low return projects (HL, LL), whereas risk mitigation performance showed little difference between high return and low return projects. In addition, the contingency amount did not significantly affect project return in HL, LH, and LL projects, but HH projects showed a positive relation between contingency and predicted risk amount. This article contributes to recognizing the differences between high return and low return projects and provides insights for practitioners into the relation between risk management performance and high returns in different risk conditions.

AB - "High risk high return" is a general rule in the overall industry; however, high-risk projects in the construction industry frequently fail to yield a high return. In order to achieve a sustainable business in the international construction market, contractors require an average to high return yield under high-risk conditions. This study aims to reveal what risk factors and risk management performance enables high-risk projects to yield high returns. The study investigated 124 international construction projects by Korean contractors and classified them into four groups: high-risk high-return (HH), high-risk low-return (HL), low-risk high-return (LH), and low-risk low-return (LL). The study found that risk assessment accuracy was the most important trigger in discriminating between high return projects (HH, LH) and low return projects (HL, LL), whereas risk mitigation performance showed little difference between high return and low return projects. In addition, the contingency amount did not significantly affect project return in HL, LH, and LL projects, but HH projects showed a positive relation between contingency and predicted risk amount. This article contributes to recognizing the differences between high return and low return projects and provides insights for practitioners into the relation between risk management performance and high returns in different risk conditions.

UR - http://www.scopus.com/inward/record.url?scp=85074856636&partnerID=8YFLogxK

UR - http://www.scopus.com/inward/citedby.url?scp=85074856636&partnerID=8YFLogxK

U2 - 10.3390/su11215971

DO - 10.3390/su11215971

M3 - Article

AN - SCOPUS:85074856636

VL - 11

JO - Sustainability

JF - Sustainability

SN - 2071-1050

IS - 21

M1 - 5971

ER -